鲤鱼塘面板堆石坝料场为灰岩料,料场地质条件较复杂,局部溶蚀裂隙发育,裂隙充填粘土,爆破后很多部位含泥量超出设计要求.通过优化坝体施工方案,精心组织施工,工程建设进展顺利,2006年11月6日,大坝填筑基本完成,检测结果表明,坝体填筑质量良好.
The rock of stock yard for Liyutang Face-slab Rockfill Dam is limestone. The geological condition at the stockyard is complicated. Local corrosion cranny is up-growth. The cranny has been filled with clay. Percentage of sediment at a lot of position after blow-up go beyond design specification. Through optimizing construction scheme of the dambody and organizing a construction with meticulous care, the landfill of the embankment has been almost accomplished on Nov. 6, 2006. The detection results show that the quality of the landfill of embankment is better.
出处
《三峡大学学报(自然科学版)》
CAS
2008年第1期9-12,共4页
Journal of China Three Gorges University:Natural Sciences
关键词
坝体填筑
施工优化
质量控制
embankment landfill
construction optimization
quality control