基于DSM的可中断负荷合同分析与建模 被引量:2

Analysis and modeling of interruptible load contract for demand side management
下载PDF
导出
摘要 可中断负荷管理是一项有效的电力需求侧管理措施。通过对总缺电成本和中断补偿费用的目标函数进行优化,分别建立了两种可操作的可中断负荷合同数学模型。算例仿真分析证明所提出的合同模型是切实可行的。研究成果有利于降低高峰时段的用电负荷,避免或减少昂贵的旋转备用容量,提高系统运行可靠性和经济性,实现资源的优化配置和电力工业的可持续发展。 Interruptible Load Management (ILM) is one of the most efficient measures for power demand side management (DSM). By means of optimizing the objective function of the total outage costs and interruptible compensation charge, two operable mathematical models of interruptible load contracts are built respectively. Numerical simulation results show that the presented contract models are practicable and feasible, which are beneficial to redue the peak load, avoid or cut down the expensive reserve capacity and enhance the reliability and economy of power system operation as well as realize the optimal arrangement of resources and the sustainable development of the power industry.
出处 《继电器》 CSCD 北大核心 2008年第3期27-31,共5页 Relay
关键词 电力市场 电力需求侧管理 可中断负荷管理 合同建模 electricity market demand side management interruptible load management modeling of contract
  • 相关文献

参考文献9

二级参考文献97

  • 1宋依群,倪以信,侯志俭,吴复立.基于均衡分析的总统调合同电量比例研究[J].中国电机工程学报,2004,24(7):64-67. 被引量:16
  • 2王良友,赵永亮,杨素萍,周健,黄群.电能期货合同市场的输电拥堵定价及其输电网的开放[J].中国电机工程学报,2004,24(8):12-16. 被引量:6
  • 3HullJC.期权、期货和其它衍生产品[M].北京:清华大学出版社,2000.4-5.
  • 4[1]Kirschen D. Demand-side view of electricity markets[J]. IEEE Trans on PowerSystems, 2003, 18(2): 520-527.
  • 5[5]Tuan L A, Bhattacharya K. Competitive framework for procurement of interruptible load services[J]. IEEE Trans on Power Systems, 2003,18(2): 889-897.
  • 6[6]Fahrioglu M, Alvarado F L. Designing incentive compatible contracts for effective demand management[J]. IEEE Trans on Power Systems,2000, 15(4): 1255-1260.
  • 7[7]Fahrioglu M, Alvarado F L. Using Utility information to calibrate customer demand management behavior models[J]. IEEE Trans on Power Systems, 2001, 16(2): 317-322.
  • 8[9]EPRI (Electric Power Research Institute). Designing an integrated menu of electric service options: modeling customer demand for priority service using C-VALU-the Niagara Mohawk application [Z]. Technical Report TR-100523. Oct. 1992.
  • 9[10]Myerson R. Optimal auction design[J]. Mathematics of Operations Research, 1981, 6(1): 58-63.
  • 10[11]Spence M. Job market signaling[J]. Quarterly Joumal of Economics,1973, 87(3): 355-374.

共引文献264

同被引文献21

  • 1王建学,王锡凡,王秀丽.电力市场可中断负荷合同模型研究[J].中国电机工程学报,2005,25(9):11-16. 被引量:115
  • 2任震,邝新武,黄雯莹.电力市场中可中断电价的设计[J].华南理工大学学报(自然科学版),2006,34(4):70-74. 被引量:15
  • 3赵俏姿,陈海焱,丁会凯.华中电网实施可中断负荷的成本效益及前景分析[J].上海电力学院学报,2006,22(2):171-175. 被引量:2
  • 4胡福年,吴军基,邹云.上网竞价策略的供给函数均衡分析[J].继电器,2006,34(16):68-73. 被引量:3
  • 5Cappers P, Goldman C, Kathan D. Demand response in U.S. electricity markets: Empirical evidence[J]. Energy,2010, 35(4): 1526-1535.
  • 6Walawalkar R, Femands S, Thakur N, et al. Evolution and current status of demand response (DR) in electricity markets: insights from PJM and NYISO[J]. Energy, 2010, 35(4): 1553-1560.
  • 7Torriti J, Hassan M, Leach M. Demand response experience in Europe: policies, programmes and implementation[J]. Energy, 2010, 35(4): 1575-1583.
  • 8Rahimi F, Ipakchi A. Demand response as a market resource under the smart grid paradigm[J]. IEEE Trans on Smart Grid, 2010, 1(1): 82-88.
  • 9Yu C W, Zhang S H, Chung T S, et al. Modeling and evaluation of interruptible load programs in electricity markets[J]. IEE Proceedings-C, Generation, Transmission and Distribution, 2005, 152(5): 581-588.
  • 10Helman U. Market power monitoring and mitigation in the US wholesale power markets[J]. Energy, 2006,31(6): 877-904.

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部