期刊文献+

需求价格弹性对发电侧备用容量配置的影响 被引量:4

Influence of price elasticity of demand to configuration for the reserve capacity of generation side
下载PDF
导出
摘要 需求价格弹性PED(price elasticity of demand)通过影响可中断负荷IL(interruptible load)成本进而影响到发电侧备用容量RCGS(reserve capacity of generation side)的配置,然而迄今为止,从风险角度有关量化PED对RCGS配置影响方面的研究一直被长期忽视。为此,在基于微观经济学消费者剩余理论建立IL成本的基础上,将PED引入到IL停电赔偿风险中,并基于风险管理与协调优化观点提出了市场环境下配置RCGS的数学模型,通过仿真量化分析了PED对RCGS配置的影响。仿真结果表明了增加PED将有利于减少RCGS的最优配置量以及为此所付出的代价。 Price elasticity of demand (PED) influences configuration of reserve capacity of generation side (RCGS) by influencing interruptible load (IL) cost. Quantitative analysis of PED on RCGS configuration from risk viewpoint has been ignored till now. Mathematic model of configuring RCGS in the market environment is proposed from the viewpoint of risk management and coordination optimization based on building IL cost and its interruption compensation risk by customer surplus theory in microeconomics. Influence of PED on RCGS configuration is analyzed quantitatively by simulation. Simulation results show that increasing PED is beneficial to decrease optimal configuration for RCGS and its cost.
出处 《继电器》 CSCD 北大核心 2008年第2期31-34,共4页 Relay
基金 南京航空航天大学引进人才科研基金(S0736-032)
关键词 需求价格弹性 发电侧备用容量 安全性 经济性 风险管理 协调优化 电力市场 price elasticity of demand reserve capacity of generation side security economy risk management coordination optimization electricity market
  • 相关文献

参考文献9

二级参考文献81

共引文献246

同被引文献184

引证文献4

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部