摘要
结合某长江大桥主塔墩桩基施工经验和体会,探讨在倾斜破碎岩层复杂地质情况下的桩基成孔施工技术。
Based on the experiences and understanding of the main pylon pile foundation construction in a Changjiang River Bridge, this paper discuss the boring construction technology for pile foundation with the tilted and broken rock strata.
出处
《公路交通技术》
2008年第1期91-93,100,共4页
Technology of Highway and Transport
关键词
倾斜破碎岩层
桩基成孔
施工技术
tilted and broken rock strata
boring for pile foundation
construction technology