期刊文献+

灯泡贯流式水电站励磁系统改造探讨 被引量:1

Research on improvement of bulb flow through type hydropower station excitation system
下载PDF
导出
摘要 潇湘水电站励磁系统于2002年5月随潇湘#1机组投入运行,在后期运行中,其调节性能和工作稳定性逐渐变差,为适应电力系统的发展趋势和提高企业的经济效益,潇湘水电站分别对2台机组的励磁系统进行了全面改造,改造效果良好。通过对励磁系统存在问题、技术改造方案及改造结果的深入分析和比较,总结了改造经验,指出了励磁系统在改造后仍然存在的一些问题并给出了相应的处理意见。 Xiaoxiang hydropower station excitation system was put into operation in May 2002 with No. 1 unit run. With the time going, its control performance and stable became worse. In order to keep speed with the power system development tendency and improve economical benefit, the comprehensive transformation scheme to 2 units was carried out, and the results were satisfied. By analysis and comparison of present problems, technical transformation schemes and transformation results, the transformation experience was summarized. The remained problems after excitation system transformation was pointed and relevant advice was presented.
作者 李一平
出处 《华电技术》 CAS 2008年第2期64-66,共3页 HUADIAN TECHNOLOGY
关键词 励磁系统 电网容量 电压等级 技术改造 excitation system electric power network capacity voltage rank technology improvement
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部