北仑电厂三期工程钢筋混凝土烟囱采用电动提模工艺施工,研究了其组成和原理,介绍了其工艺流程、主要技术措施、质量保证措施及质量通病防治措施,保证了安全施工,达到了质量和工期要求。
Electric-lifting formwork technology is adopted in reinforced concrete chimney of Beilun Power Plant third stage, Composition and theory of the technology are researched, and construction process, quality guarantee measures and quality defects are introduced. Then requirements of safe construction, quality and construction period are satisfied.
出处
《施工技术》
CAS
北大核心
2008年第2期52-54,共3页
Construction Technology
关键词
模板工程
钢筋混凝土烟囱
电动提升模系统
formwork engineering
reinforced concrete chimney