整体提升施工控制技术在绍兴世贸中心的应用 被引量:5

Application of Integral Hoisting Control Technology During Construction of Shaoxing World Trade Center
下载PDF
导出
摘要 绍兴世贸中心22-24层之间连廊为钢结构桁架体系,安装时采用整体吊装提升技术。整体提升过程中,由于各个吊点提升不同步,使结构产生附加内力,从而带来吊装过程结构强度和整体稳定不足的问题。采用MIDAS有限元分析软件模拟分析提升过程中,吊点提升不同步而引起结构的内力变化,提出了安全施工吊点最大位移差控制准则,为现场施工及监测提供指导。 Steel truss gallery of Shaoxing World Trade Center 22 - 24 floors is lifted by integral hoisting technology. Because of unsynchronized lifting additional internal force is caused. Structural strength and whole stability are lacking during lifting. Internal force change during lifting process is simulated and analyzed by MIDAS software. Control standards of displacement difference are proposed for safe constructing hoisting point to offer guidance for field construction and monitoring.
出处 《施工技术》 CAS 北大核心 2008年第2期57-59,共3页 Construction Technology
关键词 钢连廊 整体提升 不同步 控制位移 steel gallery integral lifting unsynchronized control displacement
  • 相关文献

参考文献4

二级参考文献12

  • 1路克宽,李树增,刘凤芝,薛喜文.巨型钢结构现场拼装与滑移技术[J].建筑技术,1995,22(11):681-682. 被引量:4
  • 2GB50017-2003.钢结构设计规范[S].[S].,..
  • 3乌建中,同济大学学报,1993年,21卷,增刊,99页
  • 4乌建中,Olhydraulik und Pneumatik,1989年,33卷,12期,968页
  • 5刘长年,电液伺服系统优化设计理论,1989年
  • 6GB50205-2001.钢结构工程施工质量验收规范.[S].中华人民共和国建设部,..
  • 7GB50026-93.工程测量规范.[S].,..
  • 8JGJ78-91.网架结构设计与施工规程.[S].,..
  • 9乔聚甫.深圳市民中心大屋盖钢结构安装综合技术[A]..第十届空间结构学术会议论文集[C].北京:中国建材工业出版社,2002..
  • 10北京市机械施工公司.首都机场四机位库钢结构施工成套技术[Z].,1996..