摘要
本工程为北京市京承高速公路(三环路至四环路段)工程,南起北京东北三环路太阳宫桥,向北经土城北路及规划中的曹慧路,止于北京市东北四环路望和桥,全长约为2 km。本文详细介绍了该道路工程的施工测量放线过程。
Name of this project is Jing Cheng highway. This paper introduce the procession of skating out in road construction, also the usual method of checking and the general circular curve calculation in construction survey.
出处
《现代测绘》
2007年第5期16-18,共3页
Modern Surveying and Mapping