摘要
介绍国产325 MW火电机组在国外进行甩100%负荷后带厂用电小岛运行试验。
The domestic 325 MW thermal power unit performed 100% load shedding and then supplying auxiliary power in abroad. The islanding operation rest was introduced.
出处
《湖北电力》
2008年第1期62-64,共3页
Hubei Electric Power
关键词
燃油燃气机组
小岛试验
甩负荷
oil fired and gas fired unit
islanding test
load shedding