摘要
物探工作对数据采集系统的接收能力提出了越来越高的要求,使用多套采集系统进行同步采集施工不失为一种经济、便捷的方法。本文结合实际,重点介绍了使用两套408UL地震仪器系统通过VE432震源控制器进行主从同步采集的施工方案。
Seismic exploration demands higher and higher receiving capacity for seismic data acquisition system. Synchro-nous acquisition using multiple recording systems is an economic and convenient replaceable way. Combining with production, the article emphasized the construction scheme using two sets of 408UL seismographs to carry out master/slaver synchronous acquisition by VE432 vibrator controller.
出处
《物探装备》
2008年第1期24-26,共3页
Equipment for Geophysical Prospecting