摘要
分析了神朔铁路店塔二号隧道产生病害的原因,提出了病害整治的施工措施,详细地介绍了该隧道病害整治的施工方法、施工工艺及既有线施工问题,并阐述了保证工程施工安全的措施,可供既有线隧道病害整治工程参考。
It analyzes the reasons which caused Shen-Shuo railway Dianta No. 2 tunnel diseases, brings forward the constructing measures on disease protection. It also introduces the constructing methods, crafts and current line construction of this tunnel disease's governing, and elaborates methods to ensure the safe construction. These could be reference for current line disease protection.
出处
《山西建筑》
2008年第8期325-326,共2页
Shanxi Architecture
关键词
既有线
施工
隧道
病害
裂缝
current line, construction, tunnel, disease, cracks