安阳地下商业城的逆作法施工

SUCCESSIVE PROCESS FOR CONSTRUCTION OF THE ANYANG CITY UNDERGROUND COMMERCIAL TOWN PROJECT
下载PDF
导出
摘要 安阳地下商业城工程位于城市交通干道地面下 ,采用先浇筑顶盖 ,待恢复路面交通后 ,再逐步掏挖土方并浇筑下部结构的逆作法施工方案。施工中还采取措施解决了地下城出入口与城市污水、雨水管线以及与埋地邮电电缆的交叉问题。 The Anyang City Underground Commercial Town project is located at city's down-town district where lies the trunk thoroughfares. During its construction, the flollowing stages bave been taken with sucessive process, namely (1) building-up of its whole R.C. roof structure first, (2) reopening of its road surface traffic, (3)continuous work of earth excavation and eventually, (4)build-up and completion of its substructure. Simultaneously diring its construction, there are various good measures to solve the following difficulties such as (1) the inlet and outlet of its underground commercial town, (2)the pipe-lines of sewerage and rainwater as well as (3) the intersections of underground post and tele-communication cable lines.
作者 赵复光
出处 《建筑技术》 北大核心 1997年第5期344-346,共3页 Architecture Technology
关键词 地下构筑物 商业建筑 土方施工 送作法 underground construction, earthwork construction, commercial building, underground pipe-line, pipe-line treatment
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部