期刊文献+

东阳市城市污水处理厂运行中的问题与对策 被引量:6

THE PROBLEMS OF DONGYANG WASTEWATER TREATMENT PLANT AND COUNTMEASURES
下载PDF
导出
摘要 针对东阳市城市污水处理厂运行面临的进水水质超标现象,分析了污水收集率低和工业污水处理达标率较低等主要原因,提出严禁工业企业废水超标排放、提高城市污水收集率和增加深度处理设施等措施,并提供了东阳市污水处理厂污水深度处理的设计方案。 This paper discusses the serious problem of the influent water quality that exceeds the limited standards of Dongyang Wastewater Treatment Plant,and it analyses low wastewater collection rate and industrial wastewater discharged into the urban wastewater collected pipeline without meeting the standards.It proposes the measures such as strictly prohibit industrial wastewater discharged into the urban wastewater collected pipeline without meeting the standards and improve urban wastewater collection pipelines as well as adding advanced treatment facilities,and provides the advanced wastewater treatment design plan of Dongyang Wastewater Treatment Plant.
作者 严冰
出处 《环境工程》 CAS CSCD 北大核心 2008年第1期90-92,共3页 Environmental Engineering
关键词 污水处理 CAST工艺 对策方案 wastewater disposal,CAST process and countmeasure
  • 相关文献

同被引文献34

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部