摘要
结合具体工程概况,在分析施工条件、工程特点的基础上,提出了时速200 km^250 km客运专线铁路箱梁架设的施工方案及相应工程对策,以供类似工程参考借鉴。
Combined with general condition of concrete engineering, the author puts forward the construction scheme of railway box-girder erection in passenger special line with hourly speed of 200 km--250 km and its relevant engineering countermeasures on the basis of analyzing its construction condition and engineering characteristics, in order to offer a reference for similar engineering.
出处
《山西建筑》
2008年第9期193-194,共2页
Shanxi Architecture
关键词
客运专线
箱梁架设
施工技术
passenger special line, erection of box-girder, construction technology