摘要
通过北京地铁十号线劲松站—终点折返线区间隧道施工对周边既有建筑物影响的数值分析,探讨了隔离桩及隧道超前注浆措施对既有建筑物保护的作用,为类似工程提供了参考依据。
Through numerical analysis of the influences of subway tunnel construction in Jinsong station to end station turn-back line on No. 10 line of Beijing subway on neighboring buildings the isolation pile and advanced grouting measures are introduced for protection of neighboring existing buildings, which provide references for similar works.
出处
《山西建筑》
2008年第9期308-309,共2页
Shanxi Architecture
关键词
隔离桩
既有建筑物
侧壁注浆
数值分析
地铁
isolation pile, existing building, side wall grouting, numerical analysis, subway