摘要
阐述了客运专线支架法现浇梁施工的工艺流程,重点介绍了支架布置、支架的堆载预压、施工预拱度、模板安装、支座和支座板安装、现浇梁体施工、预应力施工等关键工序,以供参考。
The following paper illustrates the technological process of cast-in-situ beam construction in passenger special line by using support method, introduces key working procedures, such as the arrangement of brackets, accumulating load of brackets, camber of construction, installation of framework, installation of seat and bearing slab, construction of cast-in-situ beam, and prestressed construction, in order to offer a reference.
出处
《山西建筑》
2008年第9期314-314,329,共2页
Shanxi Architecture
关键词
客运专线
支架法
模板
预应力
passenger special line, support method, framework, prestress