摘要 在分析盾构隧道盾尾同步注浆的作用机理的基础上,采用理论分析及计算的方法,重点对同步注浆的注浆压力和注浆量进行了分析和研究。获得了在三个主要影响因素下注浆压力的确定方法,注浆量与注浆填充率、推进速度的关系,及注浆压力及注浆量的量化方法。 Based on the analysis of the mechanism of synchronous grouting in shield tunneling, the grouting pressure and grouting volume are studied by the methods of theoretic analysis and calculation. Through the studies, the method of determining grouting pressure under three key factors, that is, the relationship between grouting volume, filling ratio and advance speed, and the quantitative method for grouting pressure and grouting volume are gained.
出处 《地下空间与工程学报》 CSCD 2008年第1期130-133,共4页 Chinese Journal of Underground Space and Engineering
关键词 盾构隧道 同步注浆 注浆压力 注浆量 shield tunneling synchronous grouting grouting pressure grouting volume
  • 相关文献

参考文献6

二级参考文献15

  • 1唐益群,叶为民,张庆贺.上海地铁盾构施工引起地面沉降的分析研究(三)[J].地下空间,1995,15(4):250-258. 被引量:57
  • 2草野一人(日).地基加固和防水药液注浆设计施工手册[M].中国铁道出版社,1989..
  • 3梁炯筠.锚固与注浆技术手册[M].北京:中国电力出版社,1999,9..
  • 4李玉珍 朱挣宏 等.日本隧道盾构新技术[M].武汉:华中理工大学出版社,1999..
  • 5张凤祥.土建注浆施工与效果检测[M].上海:同济大学出版社,1999..
  • 6张凤祥.土建注浆施工与效果检测[M].上海:同济大学出版社,1999..
  • 7Ou C.Y, Huang R.N, lmi W.J(1998). Surface settlement during shield tunneling at CH218 in Taipei. Can. C, eotech.J. 35:159 - 168.
  • 8Manuel M, l.azis M, Jose M(2002). Prediction and analysis of sulmidence induced by shield tunneling in the Madrid metro extension. Can. Geotech. J.39:1273 - 1287.
  • 9周文波.盾构施工地表沉陷测量和地面沉降预测软件的编制[J].计算机应用,2002,3:105-109.
  • 10刘洪震,赵运臣.广州地铁“越~三”区间盾构工程地表沉降原因分析[J].隧道建设,2002,22(1):20-23. 被引量:6

共引文献114

同被引文献556

引证文献78

二级引证文献568

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部