水电站上位机监控系统研究 被引量:1

Study on Senior Computer Monitoring and Control System for Hydropower Station
下载PDF
导出
摘要 为提高电厂设备的可利用率、安全运行性、减少运行和维护费用,提高监控自动化程度,研究了水电站监控系统中上位机软件开发的设计原则、系统构架、主要编码实现流程。该软件设计采用了双机与双网冗余技术和分布式体系结构,满足了水电厂"无人值班(少人值守)"功能要求。提高了系统的可靠性和系统的效率。 To improve utilization ratio, safe operation of equipment and level of supervisory control automation, and to reduce the cost of operation and maintenance, the thesis of the software exploitation of hydropower station senior computer monitoring and control system, including devising principle, system' s configuration and realization process of the program code was studied. The whole software design using the double machine & the double Web redundant technology and the distributional system in the devising of the system, satisfying the requirement of unattended substation on computer monitoring system, inproves reliability and efficiency of the power system.
出处 《低压电器》 北大核心 2008年第3期43-46,共4页 Low Voltage Apparatus
关键词 水电站监控 上位机 双网冗余 分布式体系 monitoring and control of hydropower station senior computer double Web redundant distributional system
  • 相关文献

参考文献5

  • 1陈宗梁.国外水电技术的发展[J].中国工程科学,2002,4(4):86-92. 被引量:2
  • 2华蓉彤.法国的大坝安全答理和监测技术.水力发电,1988,(5):70-72.
  • 3孙新德.国内外水电站优化调度研究综述[J].华中电力,1994,7(6):25-28. 被引量:7
  • 4PRIETO B F. Experiences in the Application of New Technologies to the EL Atazar Dam [ C ]//18 th Proceedings ICOLD. Durban, 1994, 68(29) :425-436.
  • 5TATTERSFIELD B. New Zealand Hydro Power: The Quest for Efficiency [ J ]. International Water Power and Dam Construction, 2000, 52(5):26-28.

二级参考文献11

  • 1陈宗梁.法国的大坝安全管理和监测技术[J].水力发电,1988,(5).
  • 2陈宗梁.国外水电站地下工程建设的一些经验[J].铁道工程学报,:558-577.
  • 3КyзминКК, БерезинскийСА. ТоктокульскаяГЭС[J]. ГидротехническоеСтроительство, 1972, (5): 13~18
  • 4Pellizari G. Unrivalled know- how for your dams[J].Electricite de France, 1985, (7): 23~24
  • 5华蓉彤.美国德沃歇克坝的裂缝情况[J].水力发电,1985,(7):54-55.
  • 6Prieto B F, et al. Experiences in the application of newtechnologies to the El atazar dam[A]. 18th ProceedingsICOLD[ C]. Durban: 1994. Q68, R29. 425~436
  • 7邹丽春 傅树红.世界上最高拱坝——小湾混凝土双曲拱坝[J].水利学报,:43-47.
  • 8董兴林,郭军,余闽敏.导流洞改建旋涡竖井式泄洪洞@通用设计研究[A].21世纪水力发电工程科学技术发展战略研讨论文集[C].北京:中国电力出版社,1999.138~143
  • 9陈宗梁.水工隧洞预应力混凝土衬砌技术的新进展[J].铁道工程学报,:131-137.
  • 10施熙灿,林翔岳,梁青福,姜启源,张万琪,林元烈.考虑保证率约束的马氏决策规划在水电站水库优化调度中的应用[J]水力发电学报,1982(02).

共引文献7

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部