南水北调东线穿黄河工程方案的论证与确定 被引量:4

Scheme Demonstration and Confirmation of Cross-Yellow River Project of the East Route of the South-to-North Water Transfer Project
下载PDF
导出
摘要 穿黄河工程是南水北调东线工程的关键性控制工程。通过简述穿黄河工程的论证过程和穿黄探洞的有关情况,着重介绍了有关输水规模、穿黄河工程进出口设计水位、过河线路、过河方式、隧洞洞径及工程布置型式等主要关键技术问题的研究选定,并针对性地提出了一些看法和建议。 The Cross-Yellow River Project is the critical control work of the East Route of the South-to-North Water Transfer Project. This thesis, by introducing the scheme demonstration and confirmation of cross-Yellow River project and the relative information of the probing hole, focuses on the key technique factors influencing the scheme selection of crossing on the Yellow River including the transfer scale, the design water level of the import and export, river regime, type of structure, tunnel diameter and project layout. Meanwhile, the advices and suggestions relat- eel are pertinently brought forward by the thesis.
作者 刘宁
出处 《南水北调与水利科技》 CAS CSCD 2008年第2期1-7,共7页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调 东线工程 穿黄河工程 South-to-North Water Transfer Project East Route cross-Yellow River
  • 相关文献

参考文献2

  • 1[1]水利部天津水利水电勘测设计研究院.南水北调东线第一期工程穿黄河工程初步设计报告(修订)[R].天津:水利部天津水利水电勘测设计研究院,2006.
  • 2[2]水利部天津水利水电勘测设计研究院.南水北调东线第一期穿黄河工程可行性研究报告(修订稿)[R].天津:水利部天津水利水电勘测设计研究院,2003.

同被引文献17

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部