司家营铁矿残留矿体回收方案设计 被引量:3

Scheme Design for Recovering Residual Orebody in Sijiaying Iron Mine
下载PDF
导出
摘要 结合唐钢司家营铁矿北区Ⅲ采场即将由露天开采转为地下开采的实际和N2-N4线间残留矿体的赋存状况,对残留矿体的回收方案进行了设计。 In light of the reality that No. 3 pit in north area of Sijiaying Iron Mine will proceed from open pit mining into underground mining and the occurrence of the residual orebody remaining between N2 and N4 lines, a scheme for recovering the residual orebody is designed.
出处 《金属矿山》 CAS 北大核心 2008年第3期35-37,共3页 Metal Mine
关键词 露天转地下开采 残矿回收 无底柱分段崩落法 Transition from open pit to underground mining, Recovery of residual orebody, Pillarless sublevel caving
  • 相关文献

参考文献5

二级参考文献11

  • 1南世卿,赵兴东.断层影响下境界矿柱稳定性数值分析[J].金属矿山,2005,34(3):28-30. 被引量:17
  • 2马天辉,杨天鸿,赵兴东,张永彬,唐春安,林鹏.露天转井下开采境界顶柱参数三维有限元分析[J].金属矿山,2006,35(1):61-64. 被引量:10
  • 3Tang C A. Numerical simulation of rock failure and associated seismicity. Int J Rock Mech Min Sci, 1997,34:249-262.
  • 4Hoek E, Brown E T. Empirical Strength Criterion of Rock Masses. J Geotech Engrg,1980,106:1013-1035.
  • 5Bieniawski Z T. Determining Rock Mass Deformability. Int J Rock Mech Min Sci, 1978,15 (5) :237-247.
  • 6Deere D U. Technical Description of Cores for Engineering Purposes.Rock Mech Eng Geot, 1963,1(1):1-22.
  • 7Kaiser P K and Tang C A. Numerical simulation of damage cumulation and seismic energy release during brittle rock failure Part Ⅱ: Rib pillar collapse. Int J Rock Mech Min Sci, 1998,35:123-134.
  • 8Tang C A and Kaiser P K. Numerical simulation of cumulative damage and seismic energy release during brittle rock failure-Part Ⅰ:Fundamentals. Int J Rock Mech Min Sci , 1998,35: 113 - 121.
  • 9Tang C A ,Xua X H,Kouc S Q,et al. Numerical investigation of particle breakage as applied to mechanical crushing, Part Ⅰ: Single - particle breakage. Int J Rock Mech Min Sci ,2001,38:1147-1162.
  • 10汪勇.采空区上方安全顶柱厚度的确定方法[J].矿业快报,2002(1):17-18. 被引量:40

共引文献17

同被引文献9

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部