摘要
通过对青岗峡水电站坝体填筑施工过程的测量控制,用编程计算器与全站仪的配合,可以准确其定位,提高工作效率,具有较强的实用价值。
By survey control of the process of embankment fill for Qinggangxia hydropower project, it can accurately define its location and increase working efficiency in combination with programming calculator and full station, which has greater practical value.
出处
《西北水电》
2008年第1期18-19,共2页
Northwest Hydropower
关键词
测量控制
编程
青岗峡
survey control
programming
Qinggangxia hydropower project