小湾水电站坝基固结灌浆特点和施工质量控制 被引量:16

Consolidation grouting features of dam foundation and construction quality control for Xiaowan hydropower project
下载PDF
导出
摘要 小湾水电站坝基开挖深度大、地应力高、坝基岩体卸荷松弛严重、表层岩石裂隙连通率好。采用有盖重固结灌浆,工程量大、工期短,与坝体混凝土浇筑和温控防裂关系密切,固结灌浆工艺复杂多样,施工干扰多,质量管理难度大。主要针对小湾坝基固结灌浆的特点和质量控制措施进行总结,供其它同类型工程借鉴。 There exist big excavated depth of dam, high geostatic stress, severe relief & relaxation and good interconnection of rock fissures on surface stratum. The weighted consolidation grouting is applied with a large amount of engineering quantity, and has a clear relationship with dam concreting and temperature control for cracks. The consolidation grouting technology is complicated and varied, with construction interferences and great quality management. By conclusion of consolidation grouting features and quality control measures for Xiaowan hydropower project, it will provide reference for other similar projects.
作者 卢元海 方伟
出处 《西北水电》 2008年第1期33-35,38,共4页 Northwest Hydropower
关键词 小湾水电站 固结灌浆 质量控制 Xiaowan hydropower project consolidation grouting quality control
  • 相关文献

同被引文献53

引证文献16

二级引证文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部