摘要
万家寨水电站装有6台立轴混流式水轮发电机组,通过分析万家寨水电站主变冷却器控制系统硬件配置、主要功能特点等设计情况,对同类型控制系统设计有一定借鉴意义。
Six vertical shaft tubular generating units are installed in Wanjiazhai Multipurpose Dam Project. By analysis of hardware con- figuration of main transformer control system and main function, there provides certain reference for the design of similar control system.
出处
《西北水电》
2008年第1期46-47,共2页
Northwest Hydropower
关键词
主变冷却器
控制核心
冗余测量
控制系统
main transformer cooler
control core
redundant control system