期刊文献+

某斜拉桥施工过程中塔梁检测的应用研究

Research on the Testing of the Bridge Tower and Main Beam in the Construction of a Cable-stayed Bridge
下载PDF
导出
摘要 斜拉桥作为一种常见的大跨度桥梁结构形式,在施工中一般应对其斜拉索以及塔梁进行检测,并对相应的施工过程进行控制,以保证施工的顺利进行,确保施工质量。文中以某斜拉桥的施工为背景,较为详细地讨论了斜拉桥钢筋混凝土桥塔、主梁检测断面的布置、检测工作的内容以及施工质量检测标准,以期为同类工程的检测提供参考。 As a common type of great-span bridge structure in the construction of cable-stayed bridge, testing of the cable, tower and beams should be carried out in a general way to control the construction of the bridge and ensure the quality of the bridge. The arrangement of testing cross-sections of the tower and beams, the work of the testing and the criterions are studied in detail. The results can provide uses for reference and consult in other similar engineering.
出处 《国外建材科技》 2008年第1期80-83,共4页 Science and Technology of Overseas Building Materials
关键词 斜拉桥 桥塔 主梁 检测 cable-stayed bridge bridge tower main beam testing
  • 相关文献

参考文献3

  • 1JTJ041-2000,中华人民共和国行业标准.公路桥涵施工技术规范[S].北京:人民交通出版社,2000.
  • 2JTJ022-85,中华人民共和国交通部部标准.公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,1993.
  • 3陈德伟,郑信光,项海帆.混凝土斜拉桥的施工控制[J].土木工程学报,1993,26(1):1-11. 被引量:67

二级参考文献3

  • 1郑信光,同济大学学报,1991年,19卷,3期
  • 2陈德伟,1990年
  • 3陈德伟,城市道桥与防洪,1988年,1期

共引文献66

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部