城市轨道交通建设项目投资控制措施分析

Analysis of investment control measures for urban rail transit projects
下载PDF
导出
摘要 伴随着城市轨道交通的大规模发展,投资控制已成为设计者面临的一个关键问题。城市轨道交通项目投资控制应贯穿于项目实施的全过程,只有这样,才能达到控制投资的最佳效果。此文主要分析城市轨道交通项目为达到投资控制的目标,在各阶段应采取的组织措施、管理措施、经济措施和技术措施等。 Along with the development on a large scale of the urban rail transit system, investment control has become a vital issue confronting the designers. The investment control over urban rail transit projects should run through the whole process of the implementation of the project. Only by doing so can the optimum resuits be obtained of investment control. This article performs an analysis mainly on the chief measures in terms of organization, management, economics and technicality in the various phases of the project in a bid to shoot the target of investment control.
作者 侯占林
出处 《铁路工程造价管理》 2008年第2期15-17,共3页 Railway Engineering Cost Management
关键词 城市轨道交通 建设项目 投资控制 措施分析 Urban rail transit system construction project investment control measures analysis
  • 相关文献

参考文献4

二级参考文献10

共引文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部