期刊文献+

宛坪高速公路下穿宁西铁路框架桥施工技术 被引量:2

Construction Technology for the Framed Bridge of the Wan Ping Expressway Under-passing the Ning-Xi Railway
下载PDF
导出
摘要 结合宛坪高速公路宁西铁路分离立交工程施工实际,将原顶进方案变更为架空明挖现浇方案,介绍了线路的架空、基坑开挖及框架梁现浇等施工关键技术,进行了相关的分析验算。实践表明该施工方案具有安全可靠、进度加快、施工方便等优点。 With the flyover project of the Wan Ping Expressway under-passing the Ning-Xi Railway, in which case the originally chosen jacking-in construction plan has been changed into the overhead-open-cut- and-cast-in place construction plan, as a practical example, the key construction techniques for the overhead --line construction, the open-cut constriction of foundation pits, and the cast-in-place construction of the framed girders are presented in the paper, with the corresponding checking calculations and analyses performed. Practice proves the construction plan safe,reliable, time-saving, and convenient.
作者 刘峰
出处 《国防交通工程与技术》 2008年第2期46-48,52,共4页 Traffic Engineering and Technology for National Defence
关键词 框架桥 线路架空 明挖基坑 framed bridge overhead lines open-cut pit
  • 相关文献

参考文献4

二级参考文献4

共引文献15

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部