基于进度优化的大型项目激励机制模型 被引量:10

The Incentive Mechanism of Large-scale Projects Based on Scheduling Optimization
下载PDF
导出
摘要 在项目管理实践中,业主通常会设立激励机制以确保项目按期完成,而承包商则会根据业主设定的激励机制合理安排项目进度。本文讨论了大型项目的激励机制,研究了业主和承包商的决策问题,建立了以项目收益净现值最大化为目标函数的Stackelberg主从递阶决策模型。通过各子项目激励强度的设定对激励机制进行优化,协调业主和各承包商的利益关系,进而实现业主收益的最大化。 In the practice of the project management, the client usually establishes a incentive mechanism to insure that the project will be completed punctually. This paper discusses the incentive mechanism of large-scale project, and a stackelberg model is builted up according to the decision making of the cliet and the contactors, its target is max-NVP. Then the incentive mechanism is optimized by the model, and the benefits relation between the client and contractors is harmonized.
出处 《系统工程》 CSCD 北大核心 2008年第1期102-105,共4页 Systems Engineering
基金 国家自然科学基金资助项目(70702013) 中国博士后科学基金资助项目(20070421116)
关键词 进度优化 大型项目 STACKELBERG模型 激励机制 Scheduling Optimization Large-scale Project Stackelberg Model Incentive Mechanism
  • 相关文献

参考文献15

  • 1Mol M J,Pauwels P,Matthyssens P,Quintens L. A technological contingency perspective on the depth and scope of international outsourcing[J]. Journal of International Management, 2004,10 (2) : 287-305.
  • 2Herroelen W, Reyck B D, Demeulemeester E. Resource-constrained project scheduling: a survey of recent developments[J]. Computers and Operations Research, 1998,25 (4) : 279-302.
  • 3Etgar R,Shtub A,LeBlanc L J. Scheduling projects to maximize net present value - the case of timedependent,contingent cash flows[J]. European Journal of Operational Research, 1998,96 (2) : 90-96.
  • 4江嘉旻,孙永广,吴宗鑫.收益激励的优化与最优工期的选择[J].系统工程,2000,18(3):5-10. 被引量:38
  • 5汪应洛,杨耀红.多合同的激励优化与最优工期确定[J].预测,2005,24(2):60-63. 被引量:41
  • 6柴国荣,徐渝,雷亮.合同双方联合角度的R&D项目激励机制优化研究[J].科研管理,2006,27(4):110-115. 被引量:8
  • 7Kolisch R,Padman R. An integrated survey of deterministic project scheduling[J]. Omega, 2001,29 (3) : 249-272.
  • 8De Reyck B,Herroelen W. The multi-mode resourceconstrained project scheduling problem with generalized precedence relations [J]. European Journal of Operational Research, 1999,119 (2):538-556.
  • 9Talbot B. Resource-constrained project scheduling with time-resource tradeoffs, the non-preemptive case [J]. Management Science, 1982,28 (10) : 1197-1210.
  • 10Kaplan L. Resource-constrained project scheduling with preemption of jobs[D]. University of Michigan, 1988.

二级参考文献31

  • 1江嘉旻,系统工程,1999年,17卷,2期
  • 2盛昭翰,主从递阶决策论-Stackelberg问题,1998年
  • 3冯允成,活动网络技术,1991年
  • 4Davis E W,AIIE Trans,1973年,297页
  • 5盛昭翰.主从递阶决策论-Stackelberg问题[M].北京:科学出版社,1998.1-40.
  • 6Vallee T, Basar T. Off-line compution of stackelberg solutions with the genetic algorithm[J].Computational Economics, 1999, 13(3):201-209.
  • 7Erenguc S S, Tufekci S, Zappe C J.Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics,1993, 40:25-50.
  • 8Patterson J H, Taibot F B, Slowinski R, et al..Computational experience with a backtracking algorithm fro solving a general class of precedence and resource-constrained scheduling problems[J].European Journal of Operational Research,1990,49:68-79.
  • 9Sung C S, Lim S K. A project activity scheduling problem with net present value measure[J].International Journal of Production Economics,1994,94:177-187.
  • 10Sunde L, Lichtenberg S.Net-present-value cost/time tradeoff[J].International Journal of Project Management,1995,13:45-49.

共引文献68

同被引文献92

引证文献10

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部