秦山三期(重水堆)核电站工程建设和重大技术创新

Project Construction and Important Technical Innovation for Qinshan Phase Ⅲ(PHWR) Nuclear Power Plant
下载PDF
导出
摘要 秦山三期重水堆核电站是我国首座商用重水堆核电站,也是中国和加拿大两国政府间迄今最大的贸易项目。业主秦山第三核电有限公司在工程建设、调试及自主运行的过程中,坚持自主创新管理,有效实施工程质量、进度和投资三大控制;并在消化吸收CANDU-6技术的基础上进行改进,提高机组的安全性和可靠性。工程的建设实践,使我国核电工程管理在已有的基础上,基本实现了程序化、信息化的规范管理并与国际接轨。工程建成后,在保证机组安全稳定运行的基础上又进行了多项技术改进和创新,使机组性能持续提高。在人才培养方面,注重培育企业文化,强化人员培训,建立起员工培训与工程建设互相促进的良性循环机制。秦山三期工程在核电项目管理水平的提高和发展,可为推动我国核电发展和大型引进工程的规范化管理提供借鉴。 Qinshan Phase Ⅲ (PHWR) Nuclear Power Plant, the first commercial heavy water reactor nuclear power plant in China, was the biggest trade project performed between the governments of China and Canada. As the owner, the Third Qinshan Nuclear Power Company (TQNPC) persisted in independent innovation management during the project construction, commissioning and selfdependent operation, efficiently realizing the three controls of the project, i.e. quality control, schedule control and investment control, and persisted in technical improvement on the basis of digestion and absorption of CANDU - 6 technology to improve the unit safety and reliability. The project construction practice has helped China' s nuclear power project management to become programmed, computerized, standardized and management internationalized on the existing basis. After completion of the project, with unit safe and steady operation as the prerequisite, TQNPC performed several technical modifications and innovations to continuously improve the unit performance. In the area of staff development, TQNPC paid much attention to cultivation of corporate culture, strengthed staff training and built up a good circulating mechanism with staff training and project construction promoting each other. Further to "Zero Breakthrough" and a new step forward of locolization successfully realized in Qinshan nuclear power plant and nuclear power qinshan joint venture company, the improvement and developemnt of nuclear power project management level in Qinshan Phase Ⅲ(PHWR) nuclear power plant provided reference for promotion of nuclear power development in China and standardized management of introducing large imported project.
出处 《中国工程科学》 2008年第3期73-86,共14页 Strategic Study of CAE
关键词 秦山三期重水堆 核电站 工程建设 技术创新 Qinshan Phase Ⅲ heavy water reactor nuclear power plant project construction technical innovation
  • 相关文献

参考文献1

  • 1康目新.秦山三期重水堆核电站建设经验汇编[M].北京:原子能出版社,2003

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部