期刊文献+

钢框架后张抗震梁柱节点的非线性分析

Nonlinear analysis of seismic resistance capacity of posttensioned column-beam connections for steel frames
下载PDF
导出
摘要 推导了后张顶底角钢梁柱节点的初始刚度及极限承载力的一般公式,并利用ANSYS建立了其三维有限元模型,模拟该节点在地震荷载下的受力特征。分析表明,后张顶底梁柱节点具有与传统焊接刚性节点相近的刚度,能够充分发挥各个组成构件的性能,且残余变形较小。对比证明,角钢厚度和后张力大小是影响节点性能的主要因素。最后针对后张节点的薄弱环节提出了适合应用的改进形式。 The general formula of initial stiffness and ultimate load for posttensioned column-beam connections of top and bottom angle are derived.A three-dimension finite element model for the column-beam connection is set up by the ANSYS,the dynamic behavior of the connections under earthquake loads is simlated.The results analyzed are indicated that the stiffness of the posttensioned column-beam connections is similar to that of the welded connections,performances of its components can be brought full play,and residual displacement is small.The angle thickness and the posttensioned force are major factors,which are influenced on the performance of the connections.Finally,a suitable improved form that is pointed to the connection's weak parts is put forward.
机构地区 江苏大学理学院
出处 《世界地震工程》 CSCD 北大核心 2008年第1期122-127,共6页 World Earthquake Engineering
基金 江苏省高校自然科学基金(04KJD130041)
关键词 后张钢绞线 梁柱节点 非线性 角钢 ANSYS posttensioned tendons column-beam connections nonlinear angle ANSYS
  • 相关文献

参考文献10

  • 1Mahin S A. Lessons from damage to steel buildings during the Northridge earthquake[ J ]. Engineering Structures, 1998,20 (1) :4 -6.
  • 2SAC. Interim guidelines : Evaluation,repair,modification and design of steel moment frames[ R]. FEMA2267, Report No. SAC295202. SAC. Joint. Venture, Sacramento, California, 1995.
  • 3SAC. Interim guidelines advisory No. 2 . FEMA2267B[ R]. Report. No. SAC299201. SAC. Joint . Venture,Sacramento, California,1999.
  • 4杨尉彪,高小旺,张维嶽,易方民,王巍,肖伟.高层建筑钢结构梁柱节点试验研究[J].建筑结构,2001,31(8):3-8. 被引量:63
  • 5吴芸,吴华英,张溶,彭少民.狗骨式刚性连接钢框架结构抗震性能试验研究[J].武汉理工大学学报,2003,25(5):37-39. 被引量:16
  • 6赵大伟,石永久,陈宏.低周往复荷载下梁柱节点的试验研究[J].建筑结构,2000,30(9):3-6. 被引量:36
  • 7石永久,李兆凡,陈宏,王元清.高层钢框架新型梁柱节点抗震性能试验研究[J].建筑结构学报,2002,23(3):2-7. 被引量:76
  • 8Ricles J M. Posttensioned seismic-resistant connections for steel frames [ J ]. Journal of Structural Engineering, 2001,127 (2) : 113 - 121.
  • 9Rieles J M. ASCE Experimental evaluation of earthquake resistant pssttensioned steel connections[J]. Journal of Structural Engineering, 2002, 128(7) :850-859.
  • 10Azizinamini A, Bradburn J H, Radziminski J B. Static and cyclic behavior of semi-rigid steel beam-to-column connections [ R ]. Columbia : Department of Civil Engineering, University of South Carolina,1985.

二级参考文献14

  • 1.JGJ101-96.建筑抗震试验方法规程[S].,..
  • 2[1]William E Gates, Manuel Morden. Professional Structural Engineering Experience Related to Welded Steel MomentFrames Following the Northridge Earthquake[J]. The Structural Design of Tall Buildings, 1996, 5(1): 29 -44.
  • 3[2]Duane K Miller. Lessons Learned from the NorthridgeEarthquake [J]. Engineering Structures, 1998, 20 (4-6):249 - 260.
  • 4[3]Egor Paul Popov, Tzong-shuoh Yang and Shih-po Chang.Design of Steel MRF Connections before and after 1994Northridge Earthquake[J]. Engineering Structures, 1998, 20(12): 1030-1038.
  • 5[5]GB 50011-2001,建筑抗震设计规范[S].
  • 6[6]FEMA. Recommended Seismic Design Criteria for New Steel Moment-Frame Buildings[J]. USA: Federal Emergency Management Agency, 2000.
  • 7[7]Le-wu Lu et al. Critical Issues in Achieving Ductile Behavior of Welded Moment Connections[J]. Journal of Constructional Steel Research, 2000, 55(1-3): 325-341.
  • 8Bertero V V, Anderson,Krawinkler H. Performance of Steel Building Structures During Northridge Earthquake[R].Berkeley. EERC Report. California :Univ of Calif, 1994.
  • 9Nakashima M,Bruneu M. English Edition of Preliminary Reconnaissance Report of the 1995 Hyogoken-Nanbu Earthquake[R]. Tokyo:The Arch Inst of Japan (AIJ), 1995.
  • 10Egor Paul Popov,Keynote Paper in ICASS’96,1996年

共引文献169

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部