期刊文献+

莱城发电厂1号机组低真空原因分析及处理 被引量:2

CAUSE ANALYSIS OF LOW VACUUM FOR UNIT NO.1 IN LAICHENG POWER PLANT AND REMEDY THEREOF
下载PDF
导出
摘要 2006年11月,莱城发电厂4×300MW机组循环水泵自高速切换低速运行后,经对比发现1号机组凝汽器真空偏低约1.5kPa,凝汽器循环水进水温度高4℃~5℃,导致机组煤耗率增加约3.11g/(kw·h),经济性显著降低。经过原因分析及处理,消除了真空下降后,提高了1号机组运行的经济性。 After switching over the circulating - water pump of 4 × 300 MW units in Laicheng Power Plant from high speed to low speed operation in November, 2006, it had been discovered from comparison that the condenser's vacuum of unit no. 1 was somewhat lower than about 1.5 kPa, the inlet water temperature of the circulating - water pump was 4℃-5℃ higher, leading to the coal consumption ratio of said unit being increased by about 3. 18 g/(kW · h), the economic efficiency being obviously lowered. Through cause analysis and remedy, the economic efficiency in operation of unit no. 1 has been improved after eliminating the vacuum drop.
作者 王承亮
机构地区 莱城发电厂
出处 《热力发电》 CAS 北大核心 2008年第3期83-84,90,共3页 Thermal Power Generation
关键词 300 MW机组 冷却塔 真空 循环水泵 节能 凝汽器 300 MW unit cooling tower vacuum circulating- water pump energy- saving condenser.
  • 相关文献

同被引文献12

引证文献2

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部