摘要
根据地区负荷分布和电厂合理供电范围,研究最佳接入系统方式,并提出系统运行对电厂的技术要求,完成对秸秆电厂接入系统的设计。
Based on area load distribution and reasonable power supply range for power plant, study out the best mode connected into power system, and provide technical operating requirement for power plant, in which the straw is fired, that is completed the power plant design for connecting into power system.
出处
《广东输电与变电技术》
2008年第2期67-70,共4页
Guangdong Power Transmission Technology
关键词
秸秆电厂
接入系统
负荷预测
潮流计算
暂态稳定
Straw fired power plant Connected into power system Load forecast Power flow calculation Transientstability