期刊文献+

飞机地面作业提前/拖期调度研究 被引量:2

Research on earliness/tardiness scheduling about airplane ground job operation
下载PDF
导出
摘要 对具有不同时间窗的提前/拖期调度方法应用于飞机地面作业调度进行了研究,用模糊规划建立数学模型,用三角模糊数表示了地面作业中时间的不确定性,应用粒子群优化算法对模型进行了仿真。实验结果表明,在不同情况下该算法都能取得较为满意的结果。 This paper has researched the airplane ground job operation using earliness and tardiness scheduling with distinct due windows,the mathematic model is established by fuzzy programming,the uncertain processing time are denoted by the triangle fuzzy numbers,and simulation using particle swarm optimization is given to illustrate the efficiency of the presented models and the optimal algorithms.
作者 王芹 樊玮
出处 《计算机工程与应用》 CSCD 北大核心 2008年第10期214-216,229,共4页 Computer Engineering and Applications
基金 国家自然科学基金(the National Natural Science Foundation of China under Grant No.60472123)
关键词 飞机地面作业 提前/拖期调度 模糊规划 粒子群算法 airplane ground job earliness/tardiness scheduling fuzzy programming particle swarm optimization
  • 相关文献

参考文献5

  • 1邢建民,刘绍华,樊玮,计雷.基于多Agent的飞机地面作业系统设计[J].中国民航学院学报,2006,24(3):24-27. 被引量:4
  • 2Ishibuchi H,Misal S,Tanaka H.Mndified simulated annealing algorithms for the flow shop sequencing problem[J].European Journal of Oper Res, 1995,81:388-398.
  • 3Zimmermann H J.Fuzzy sets theory and drecht:Kluwer Aedemic Publishers,1987.
  • 4Wang D W,Cheng X Z,Li Y.Experimental push/pull production planning and control system[J].Production Planming Control,1996,7:236-241.
  • 5黄岚,王康平,周春光,庞巍,董龙江,彭利.粒子群优化算法求解旅行商问题[J].吉林大学学报(理学版),2003,41(4):477-480. 被引量:139

二级参考文献7

  • 1Eberhart R, Kennedy J. A New Optimizer Using Particles Swarm Theory[C]. Proc Sixth International Symposium on Micro Machine and Human Science. Nagoya, Japan: IEEE Service Center, Piseataway.1995.39-43.
  • 2Xie X, Zhang W, Yang Z. Adaptive Particle Swarm Optimization on Individual Level[C]. International Conference on Signal Processing (ICSP 2002). Beijing: 2002. 1215-1218.
  • 3Parsopoulos K E, Vrahatis M N. Recent Approaches to Global Optimization Problems Through Particle Swarm Optimization[J]. Natural Computing, 2002, 1(2-3): 235-306.
  • 4Ray T, Liew K M. A Swarm Metaphor for Multiobjective Design Optimization [J]. Engineering Optimization,2002, 34(2): 141-153.
  • 5Lin S, Kernighan B W. An Effective Heuristic Algorithm for the Traveling Salesman Problem[J]. Operations Res, 1973, 21: 498-516.
  • 6黄岚 王康平 周春光.Hybrid Ant Colony Algorithm for Traveling Salesman Problem (基于蚂蚁算法的混合方法求解旅行商问题).Journal of Jilin Unlversity(Science Edition)[吉林大学学报(理学版)],2002,40(4):369-373.
  • 7樊玮.多Agent收益管理决策支持系统设计[J].计算机应用,2004,24(S1):79-81. 被引量:1

共引文献141

同被引文献16

  • 1杨神化,施朝健,关克平,应士君.基于MAS和SHS智能港口交通流模拟系统的开发与应用[J].系统仿真学报,2007,19(2):289-292. 被引量:14
  • 2姚韵,朱金福,柏明国.航班过站地面服务的优化调度算法[J].信息与控制,2007,36(4):486-492. 被引量:19
  • 3Vermeulen I, Bohte S, Somefun K, et al. Improving patient schedules by multi-agent Pareto appointment exchang- ing[C]//Proceedings of the 8th IEEE International Conference on E-Commerce Technology and the 3rd IEEE International Conference on Enterprise Computing. Piscataway, NJ, USA: IEEE, 2006.
  • 4Li J Q, Mirchandani P B, Borenstein D. Real-time vehicle rerouting problems with time windows[J]. European Journal of Operational Research, 2009, 194(3): 711-727.
  • 5Juran I, Prashker J N, Bekhor S. A dynamic traffic assignment model for the assessment of moving bottlenecks[J]. Transportation Research, Part C: Emerging Technologies, 2009, 17(3): 240-258.
  • 6Mao X Y, Mors A, Roos N, et al. Agent-based scheduling for aircraft deicing[C]//Proceedings of the 18th Belgium- Netherlands Conference on Artificial Intelligence. Reston, VA, USA: AIAA, 2007: 229-236.
  • 7Xing Z W, Li Y. Research of algorithms for aircraft ground deicing operation scheduling model[C]//2010 8th World Congress on Intelligent Control and Automation. Piscataway, NJ, USA: IEEE, 2010: 5973-5977.
  • 8Mao X Y, Mors A, Roos N, et al. Using neuro-evolution in aircraft deicing scheduling[M]//Annual Symposium on Adaptive and Learning Agents and Multi-Agent Systems. New York, NY, USA: Springer, 2007: 138-145.
  • 9Mors A, Mao X Y, Roos N, et al. Multi-agent system support for scheduling aircraft de-icing[C]//Proceeding of ISCRAM 2007- Intelligent Human Computer Systems for Crisis Response and Management. Brussels, Belgium: Brussels University Press, 2007: 467-478.
  • 10Chen W, Decker K S. The analysis of coordination in an information system application - Emergency medical services[M]//Lecture Notes in Computer Science: vol.3508. Berlin, Germany: Springer-Verlag, 2005:36-51.

引证文献2

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部