期刊文献+

MTO生产模式的交货期决策模型及其分析 被引量:17

Delivery Time Model and Its Analysis Based on MTO Manufacturing Mode
下载PDF
导出
摘要 通过对订单生产模式下产品提前或延期交付所引发的成本分析,以单位产品收益最大为目标构建交货期决策模型,并对模型进行最优性及交货期决策分析。分析结果表明在客户对提前交货没有限制且制造商没有额外成本产生时,承诺交货期应大于平均交货期;延期交付不需支付罚款时,平均交货期是最优的选择;同时考虑产品提前或延期两项成本时,应以平均交货期为基础,结合相关条款综合确定承诺交货期。 By analyzing the cost resulting from delivery advance/tardiness under MTO manufacturing mode, it formulates a decision-making model with the aim of making maximum profit from a product, and analyzes the existence of optimal solution, discussing the delivery time decision. The results indicate that if the customer accepts the advance delivery without paying extra cost to the manufacturer, the promised delivery time should be more than average delivery time. If the manufacturer does not need to pay penalty under delivery tardiness, average delivery time is the best choice. When the cost of delivery advance and tardiness is considered simultaneously, the promised delivery time should be set on the basis of average delivery time in combination with other relevant items.
作者 倪卫涛 周晶
出处 《工业工程》 2008年第2期54-57,共4页 Industrial Engineering Journal
基金 国家自然科学基金资助项目(70371019)
关键词 交货期 决策模型 订单生产 供应链 delivery time decision-making model make to order supply chain
  • 相关文献

参考文献10

  • 1Hill A V, Khosla I S. Models for optimal lead time reduction [J]. Production and Operations Management, 1992, 1 (2): 185-197.
  • 2Hill A V, Hays J M, Naveh E. A model for optimal delivery time guarantees [ J ]. Journal of Service Research, 2000, 2 ( 3 ) : 254-264.
  • 3杨文胜,李莉.响应时间不确定下的交货期相关定价研究[J].中国管理科学,2005,13(2):56-62. 被引量:26
  • 4Weng Z K. Strategies for integrating lead time and customerorder decision[J]. IIE Transactions, 1999(31 ) : 161-171.
  • 5Ray S, Jewkes E M. Customer lead time management when both demand and price are lead time sensitive [ J ]. European Journal of Operational Research, 2004( 153): 769-781.
  • 6Marucheck A S, Mcclelland M K. Strategic issues in make- in-order manufacturing [ J ]. Production and Inventory Management, 1996, 2(4) :23-95.
  • 7So K C, Song J S. Price, delivery time guarantees and capacity selection [ J ]. European Journal of Operational Re- search, 1998 ( 111 ) :28-49.
  • 8Easton F, Moodie D R. Pricing and lead time decisions for make to order firms with contingent orders [ J ]. European Journal of Operational Research, 1999 ( 116 ) : 305-318.
  • 9Karmarkar U. Manufacturing lead times, order release and capacity loading[ M ]//Graves S, Rinnooy Kan A, Zipkin P. Handbooks in Operations Research and Management Science, Vol. 4, Logistics of Production and Inventory. Amsterdam: North-Holland, 1993.
  • 10Law A M, Kehon W D. Simulation modeling and analysis [M]. 2^nd ed. New York: McGraw-Hill,1991.

二级参考文献9

  • 1Hatoum K.M.,Chang Y L.Trade-off between lead time and price[J].Porduction Planning & Control,1997,8(2):158-172.
  • 2Mendelson,H.,Whang,S.Optimal incentive compatible priority ricing for the M/M/1 queue[J].Operations Research,1990,38(5):870-883.
  • 3Stalk G Jr.Time-the next source of competitive advantage[J].Harvard Business Review,1988,66(4):41-51.
  • 4Marucheck A.S.,Mcclelland M.K.Strategic issues in make-in-order manufacturing [J].Production and Inventory Management,1996,2(4):23-95.
  • 5Moorthy,S.,and Srinivasan,K.Signaling quality with a money-back guarantee:The role of transaction costs[J].Marketing Science,1995,14(4:442-466.
  • 6Bhargara,H.,Sundaresan,S.Contingency pricing for information goods and services under industry wide performance standard[J].Journal of Management Information Systems,2003,20(2):113-136.
  • 7Lax D.A.,and Sebenius,J.K.The manager as negotiator:Bargaining for cooperation and competitive gain[M].1986,Free Press.
  • 8Bazerman,M.H.,and Gillespie,J.J.Betting on the future:The virtues of contingent contracts[J].Harvard Business Review,1999,77(5):155-160.
  • 9张钦,达庆利,沈厚才.供应链中基于Stackelberg博弈的EOQ模型[J].中国管理科学,2002,10(3):38-42. 被引量:32

共引文献25

同被引文献151

引证文献17

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部