摘要
温州赵山渡引水工程是国家重点水利工程,该工程线路长,输水渠系建筑物多,型式多样,沿线地质条件复杂,为保证工程的顺利进行,重点阐述了初设阶段主要勘察内容及施工阶段主要工作,在综合分析各项勘察成果及施工地质成果基础上,为设计及施工提供了合理建议.
Wenzhou Zhaoshandu Water Diversion Project is a key state water conservancy project with long lines and complex geological conditions. There are many different types of buildings in irrigation channels. In order to guarantee the smooth progress of the project, the main survey work in the early investigation and construction stages are discussed. Based on the comprehensive analysis of the survey results and the geological information, reasonable suggestions are proposed for appropriate design and construction methods.