利用矸石充填置换开采条带煤柱的新技术 被引量:47

The new technology of waste-filling replacement mining on strip coal pillar
下载PDF
导出
摘要 提出了在煤柱中掘进巷道并利用矸石回填以置换开采出部分条带煤柱的新技术.研究了条带开采后煤柱中充填巷的布置位置、数目,并分析了置换开采前后上覆围岩的稳定性.提出在条带煤柱集中布置2条宽4.0 m、高5.0 m的矸石充填巷,巷间煤柱宽4.0 m,并进行了工程实践.结果表明,提出的矸石置换开采技术可有效控制地表变形在Ⅰ级的前提下,置换开采出条带开采留设煤柱的15%左右的煤量,同时实现矿井矸石井下处理,做到矸石不上井. New technology droved roadways in strip coal pillar and filled coal refuse in them was put forward.The place and number of waste-filling roadways was studied, and overlying strata structure before and after replacement mining was analyzed. Based on the principia that core exists in pillar after replacement mining, two filling roadways were laid together in center with high-width size of 4.0 and 5.0 m, and the pillar width of 4.0 m in filling roadway, this technical project was practiced in a coal mine. The results show that under the precondition which the earth's surface deformation can be controlled in Grade I, the waste-filling replacement technology can recover about 15% of the strip coal pillar, and the coal refuse is disposed under ground.
出处 《煤炭学报》 EI CAS CSCD 北大核心 2008年第3期259-263,共5页 Journal of China Coal Society
关键词 矸石充填 置换开采 条带煤柱 地表控制 waste-filling replacement mining strip coal pillar surface control
  • 相关文献

参考文献16

二级参考文献88

共引文献1593

同被引文献322

引证文献47

二级引证文献299

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部