期刊文献+

新型高分子材料在破碎顶板回采巷道中的应用 被引量:6

New high molecular material applied in extraction heading having cataclastic upper plate
下载PDF
导出
摘要 近年来,随着淮南矿区煤矿开采深度的增加,矿井地质条件日趋复杂,冒顶、水患等问题不断发生,严重影响安全高效生产。丁集煤矿应用新型高分子材料,对首采面回风顺槽的冒顶区进行加固、堵水、充填,支护效果显著,为同类条件下的巷道施工提供了借鉴。 Along with deepening of coal exploitation in coal mines in Huainan Region, the geological conditions become complicated day by day. Accidents such as roof collapse, water leakage or inrush occur often that influence severely the safety of mining operation. In Dingji Coal Mine, the new high molecular material is used to stop water leakage, fill and strengthen the collapse-danger section of upper plate of extraction heading thus achieving good supporting performance. The experience can be taken for reference when similar headings are constructed.
作者 洪峰
出处 《矿业工程》 CAS 2008年第2期21-23,共3页 Mining Engineering
关键词 新型高分子材料 冒顶区 加固 充填 new high molecular material collapse-danger section strengthening fill
  • 相关文献

参考文献4

二级参考文献10

共引文献50

同被引文献31

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部