针对企业在国际工程项目投标中如何选择最适合本企业招标项目进行投标的问题,分析国际工程项目投标过程中所涉及的各种风险,提出采用群决策层次分析法,应用改进的二级模糊综合评价方法,建立多项目择优投标分析模型,并运用各个指标的不同权重来计算投标项目总的优先度,从而精确、客观地选择最适合本企业的投标项目。
To solve the problem of 'How to select the most suitable project in bidding for international projects',various risks in the process of bidding for international projects were analyzed.A model for project bidding was established using AHP and the modified fuzzy comprehensive evaluation method.The total priority of international projects was calculated by using the weight of each index so that enterprises could select their most suitable projects accurately and objectively.
出处
《水利经济》
2008年第2期46-49,共4页
Journal of Economics of Water Resources
关键词
国际工程项目投标
模糊综合评价法
层次分析法
bidding for international projects
fuzzy comprehensive evaluation method
AHP