简要介绍了太钢150万t新炼钢连铸机安装工程概况,对连铸系统设备的安装及吊装的重点和难点问题进行了深入的探讨。
This paper introduces the general situation of the installment work of 1.5 million ton new steelmaking conticaster in Taiyuan Iron & Steel Complex, and probes into the emphases and difficulties in the installment and hoisting of conticasting system equipment.