积极谋划 精心准备 迎接中线工程2003年开工建设

To Plan Positively and Get Ready to Start the Middle Route Project of the South - North Water Transfer in the Year 2003
下载PDF
导出
摘要 该文阐述南水北调中线工程河北段准备工作,包括主体工程开工前的各项准备、配套工程规划设计、建设资金筹措、工程建设管理机制研究与机构筹建以及宣传工作,等等。积极迎接中线工程2003年开工建设。 The article has summed up the preparatory work in Hebei section of the middle route project of the South- North Water Transfer, including the work for the principal part of the project, the plan and design of the accessory project, the study on construction management mechanism and the setting up of related organizations, in order to initiate the construction of the project in 2003.
作者 张锦正
机构地区 河北省水利厅
出处 《南水北调与水利科技》 CAS CSCD 2003年第1期23-25,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 南水北调中线工程 河北省配套工程规划设计 主体工程开工准备 the middle route project of the South - North water transfer, the plan and design of the accessory project in Hebei province, the preparatory work for the principal part of the project.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部