摘要
本文通过对某砖混住宅人工挖孔桩采用高压旋喷处理流砂层的总结,分析了人工挖孔桩施工产生流土、流砂渗透破坏的水文地质条件,介绍了高压旋喷的设计方法、施工技术参数和处理后的试验检测结果。
Through summarizing the brick-concrete house project which apply high-pressure rotating process to manage with drift sand stratum in manual-excavation pile constructio, analyse thehydrogeological condition to produce drift sand and drift soil seepage failure, and introduce the design method, construction technical parameter and testing results.
出处
《地基处理》
2008年第1期8-11,共4页
Journal of Ground Improvement
关键词
人工挖孔桩
流砂层
高压旋喷
Manual-excavation pile
Drift sand stratum
Contrastive test
high-pressure rotating