摘要
结合曹娥江闸前大桥水中墩工程实例,介绍了在强涌潮、高潮差、江水大流速条件下,水下钻孔灌注桩的施工技术和经验。
According to the underwater pier project in front of floodgate of Cao-e River, this paper introduced the construction technology of underwater bored pile under different conditions of strong eagre, great tidal range, and high velocity of fiver flow.
出处
《工程质量》
2008年第4期30-33,共4页
Construction Quality
关键词
涌潮
护筒
平台
钻孔桩
eagre, guard cylinder, flat roof, bored pile