基于建设项目全寿命周期管理理念的金融输电权机制研究 被引量:2

Research on Financial Transmission Right Mechanism Based on Construction Items' Whole-life Cycle Management Idea
原文传递
导出
摘要 电力工业改革面对的一个最重要的挑战是维持电力系统运行的可靠性在可接受的水平,同时提高整个电力工业运营的经济效率。输电权可以对放松管制环境下的输电投资和扩展规划发挥重要的作用,金融输电权机制是一种与市场价格相关的支付机制。基于建设项目全寿命周期管理理念的金融输电权机制以金融市场定价机制为核心,同时强调以电网全寿命周期费用分析作为确定输电权交易价格空间的基础,使输电权交易回归理性,让市场成员能够在理性的决策空间中进行金融输电权交易,同时对于激励电网扩容具有重要意义。 An important challenge of power industry reform is maintaining the reliability of power system at acceptable level while enhancing the economic efficiency. FIR is a payment mechanism related to market price,which can make an important role in investment and expansion of power transmission at relaxed controls.The FTR mechanism based on construction items' whole-life cycle management idea,which takes the market pricing mechanism as a core and is based on the whole-life cycle cost analysis of grid determining the FTRs' price, make FIR transaction rational,and make market members decide FTR biding reasonably, and also is important to encouraging power grid expansion.
出处 《电力建设》 2008年第4期24-27,共4页 Electric Power Construction
关键词 建设项目全寿命周期管理 全寿命周期费用分析 金融输电权 construction items' whole-life cycle management idea expense analysis of whole-life cycle FTR
  • 相关文献

参考文献2

二级参考文献25

  • 1OREN S S,SPILLER P T,VARAIYA P et al.Nodal Prices and Transmission Rights:A Critical Appraisal.The Electricity Journal,1995,9(2):24-35.
  • 2USA Department of Energy.National Transmission Grid Study (Mimeo,2002).http://certs.lbl.gov/.
  • 3CONTRERAS J,GROSS G.Transmission Investment in Competitive Electricity Market.In:Proceedings of Bulk Power System Dynamics and Control Ⅳ.Cortina d' Ampezzo (Italy):2004.
  • 4ANDERSON K P,MCCARTHY A.Transmission Pricing and Expansion Methodology:Lessons from Argentina.Utilities Policy,1999,8(4):199-211.
  • 5NADIRA R,AUSTRIA R R,DORTOLINA C A et al.Transmission Planning Today:A Challenging Undertaken.The Electricity Journal,2004,17(4):25-32.
  • 6CHAO X Y,FENG X M,SLUMP D J.Impact of Deregulation on Power Delivery Planning.In:Proceedings of 1999 IEEE Power Engineering Society Transmission and Distribution Conference,Vol 1.New Orleans (LA,USA):1999.340-344.
  • 7RUDNICK H,QUINTEROS R.Power System Planning in the South America Electric Market Restructuring.In:Proceedings of VI Symposium of Specialists in Electric Operational and Expansion Planning (SEPOPE).Salvador (Brazil):1998.
  • 8RUDNICK H.Generation and Transmission in Developing Countries:Planning in a Deregulated Environment in Developing Countries:Bolivia,Chile and Peru.IEEE Power Engineering Review,1996,16(7):18-22.
  • 9WONG H,CHAO H,JULIAN D et al.Transmission Planning in a Deregulated Environment.In:Proceedings of 1999 IEEE Power Engineering Society Transmission and Distribution Conference,Vol 1.New Orleans (LA,USA):1999.350-355.
  • 10HIRST E,KIRBY B.National Transmission Grid Study Issue Papers-Transmission Planning and the Need for New Capacity (Mimeo,2002).http://certs.lbl.gov/.

共引文献46

同被引文献21

  • 1张鹏,郭永基.电气主接线可靠性评估的区间方法[J].电力系统自动化,2004,28(19):48-52. 被引量:30
  • 2尤传永.架空输电线路钢芯软铝绞线的应用研究[J].电力建设,2006,27(5):1-4. 被引量:28
  • 3谢开贵,董百强,赵霞,周家启.大型(变)电站电气主接线可靠性综合分析系统[J].电力系统自动化,2006,30(15):89-92. 被引量:15
  • 4DL/T5218-2005.220-500kV变电所设计技术规程[S].,..
  • 5任国强,董士波.全生命周期工程造价管理及其计算机实现[R].天津:天津理工学院,1994.
  • 6Billiton R, Chen Hua, Zhou Jiaqi. Generalized n + 2 state system Markov model for station-oriented reliability evaluation[J]. IEEE Trans on Power Systems, 1997, 12(4): 1511-1517.
  • 7张殿生.电力工程高压送电线路设计手册[M].2版.北京:中国电力出版社.2002.
  • 8GB50545--2010 110kV-750kV架空输电线路设计规范[S].北京:中国计划出版社,2010.
  • 9DL/T 691-1999高压架空送电线路无线电干扰计算方法[S].北京:中国电力出版社,2010.
  • 10火电行业清洁生产评价指标体系(试行)[S].北京:国家发展和改革委员会,2003.

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部