1000MW超超临界机组汽机与锅炉岛施工主吊机械选择与布置 被引量:7

Selection and Arrangement of Main Hoisting Machinery for 1 000 MW USC Unit Turbine and Boiler Island Constructions
原文传递
导出
摘要 1000MW超超临界燃煤机组汽机与锅炉岛施工主吊机械的选择与布置充分体现了一个施工企业大型机械装备水平和施工能力。通过玉环、邹县、泰州、外高桥、北仑、宁海等工程的实践,针对汽机岛、锅炉岛施工主吊机械选择与布置,从主厂房、锅炉本体、电除尘器等3个方面进行阐述。 Selection and arrang'ement of main hoisting machinery for 1000 MW USC coal firing unit turbine and boiler island constructions showcase the construction company's heavy equipment and its construction capability. Using project practices from Yuhuan, Zou County, Taizhou, Waigaoqiao, Beilun, Ninghai, etc., the selection and arrangement of main hoisting machinery for turbine island and boiler island constructions are discussed in 3 aspects, such as main power house, boiler proper, and electrostatic precipitator.
作者 王运法
机构地区 山西电建三公司
出处 《电力建设》 2008年第4期79-82,共4页 Electric Power Construction
关键词 1 000MW超超临界 主厂房 锅炉 电除尘器 主吊机械 1000 MW USC main power house boiler electrostatic precipitator main hoisting machinery
  • 相关文献

参考文献2

共引文献49

同被引文献39

引证文献7

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部