摘要
1000MW超超临界燃煤机组汽机与锅炉岛施工主吊机械的选择与布置充分体现了一个施工企业大型机械装备水平和施工能力。通过玉环、邹县、泰州、外高桥、北仑、宁海等工程的实践,针对汽机岛、锅炉岛施工主吊机械选择与布置,从主厂房、锅炉本体、电除尘器等3个方面进行阐述。
Selection and arrang'ement of main hoisting machinery for 1000 MW USC coal firing unit turbine and boiler island constructions showcase the construction company's heavy equipment and its construction capability. Using project practices from Yuhuan, Zou County, Taizhou, Waigaoqiao, Beilun, Ninghai, etc., the selection and arrangement of main hoisting machinery for turbine island and boiler island constructions are discussed in 3 aspects, such as main power house, boiler proper, and electrostatic precipitator.
出处
《电力建设》
2008年第4期79-82,共4页
Electric Power Construction
关键词
1
000MW超超临界
主厂房
锅炉
电除尘器
主吊机械
1000 MW USC
main power house
boiler
electrostatic precipitator
main hoisting machinery