期刊文献+

循环流化床锅炉安装技术探讨 被引量:5

Discussion on Circulating Fluidized Bed(CFB) Boiler Installation Technology
原文传递
导出
摘要 近年来,循环流化床(CFB)锅炉在国内热电行业得到广泛推广和使用。在实际应用中,其安装技术对锅炉的使用效能有着较大的影响。结合75t/h循环流化床锅炉现场安装经验,讨论了影响流化床、旋风分离器等重要部位的安装要求,较详细地提出了循环流化床锅炉耐磨材料施工涉及的若干问题,对该类型锅炉在安装和试运过程中需注意的问题加以阐述,为同类型锅炉的安装提供一定帮助。 CFB boilers are widely used by domestic thermoelectric industry in recent years. However, the installation technology significantly affects boiler performances. Based on experiences from a 75 t/h CFB boiler in-situ installation, this paper discusses installation requirements affecting vital components, such as fluidized bed and cyclone separator, and several issues associated with CFB boiler wear-rcsistant material constructions. Issues that should be considered during installation and test operation of this type of boilers are explained assisting installation of similar boilers.
作者 陈浩 李志敏
出处 《电力建设》 2008年第4期83-85,共3页 Electric Power Construction
关键词 循环流化床 旋风分离器 布风板 耐磨材料浇注 circulating fluidized bed (CFB) cyclone separator grid plate wear-resistant material casting
  • 相关文献

参考文献1

共引文献6

同被引文献10

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部