摘要
介绍了铁路工程混凝土供应调运的特点;并根据实际问题需要建立多目标规划模型,通过Lindo软件求得最优解,旨在探讨如何实现工程物料供应的最优化。
Introducing the characteristic of supplying and transfer of railway construction concrete; setting up multi-objective programming model based on a real problem, and finding an optimal solution by using of software Lindo, in order to discuss how to achieve the optimization of materiel's supplying in railway construction.
出处
《价值工程》
2008年第4期81-83,共3页
Value Engineering