期刊文献+

基于Automod仿真平台的钢材物流中心建模分析 被引量:5

Modeling and analysis of steel logistics center based Automod simulation platform
下载PDF
导出
摘要 在明确了钢材物流中心的服务对象、功能区域组成以及相关运行参数的基础上,应用仿真技术,基于Automod仿真平台对一般性的钢材物流中心进行了仿真建模研究.验证了所建模型的有效性,并基于所建立的钢材物流中心仿真模型,分别对钢材物流中心的改变物流技术装备配置、增加钢材加工区以及增大钢材物流量的方案进行了仿真计算,并与原有的钢材物流中心方案进行了分析比较.研究表明,采用仿真工具不但可以诊断出原有钢材物流中心运行中关键设备的利用率,而且还可以预测功能布局方式与规模改变后钢材物流中心的运行特性,所得到的仿真结果可作为钢材物流中心改造的决策依据. After ascertaining the objects served, the function areas included and relative running parameters, a model of a general steel logistics center was given based on the Automod simulation platform by using simulation technique, and then its validity was validated. Based on the model, several cases such as changing the logistics technology equipment layout, adding the steel machining area and increasing the steel logistics quantity are simulated and contrasted with the original scheme. It is indicated that using simulation can not only diagnose the efficiency of the equipments in original steel logistics center, but also forecast the running characteristic of the steel logistics center after the layout and the scale are altered, so the result can be used as a decision-making reference of rebuilding the logistics center.
出处 《东南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2008年第2期314-318,共5页 Journal of Southeast University:Natural Science Edition
关键词 钢材物流中心 Automod软件 仿真 建模 steel logistics center Automod software simulation modeling
  • 相关文献

参考文献8

  • 1罗勇,程国全.SLP法在钢材配送中心总体规划设计中的应用研究[J].物流技术,2005,24(9):54-56. 被引量:6
  • 2Timothy S, Meinert G, Don T, et al. A modular simulation approach for automated material handling systems [ J]. Simulation Practice and Theory, 1999,7( 1 ) : 15 - 30.
  • 3Jarvis J M, McDowell E D. Optimal product layout in an order picking warehouse [ J ].IIE Transactions,1991, 23( 1 ) :93 - 102.
  • 4Petersen C G, Schmenner R W. An evaluation of routing and volume-based storage policies in an order picking operation [ J ]. Decision Sciences, 1999,311 ( 2 ) : 481 - 501.
  • 5Hall R W. Distance approximations for routing manual pickers in a warehouse[ J]. IIE Transactions, 1993,25 (4) :76-87.
  • 6Hwang H S, Cho G S. A performance evaluation model for order picking warehouse design [J]. Computers & Industrial Engineering, 2006,51 ( 2 ) : 335 - 342.
  • 7Petersen C G, Aase G. A comparison of picking, storage, and routing policies in manual order picking[J]. Int J Production Economics ,2004,92( 1 ) : 11 - 19.
  • 8Rao A K, Rao M R. Solution procedures for sizing of warehouses [J].European Journal of Operational Research, 1998,108( 1 ) : 16 -25.

二级参考文献4

  • 1王家善.设施规划与设计[M].机械工业出版社,1994..
  • 2(美)缪瑟(Muther R).系统布置设计[M].北京:机械工业出版社,..
  • 3Morris Cohen,et al.Optimizer:IBM's Multi-Echelon Inventory System for Managing Service Logistics[J]. Interfaces, 1990.
  • 4李守林.配送中心的功能与设计要点[J].物流技术与应用,2001(5):28-36. 被引量:6

共引文献5

同被引文献40

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部