摘要
在大量施工实测数据的基础上,对大断面暗挖车站地表沉降及结构衬砌应变规律进行了研究,验证了该工法关键工序和关键技术的实施效果,为今后类似工程提供了宝贵的设计与施工经验。
Based on numerous actual measurement datas for construction, considering from big cross section, the paper studys its settlement of the earth's surface when a concealed-digging to the station and regulation of structure reaction. Meanwhile, critical working procedure end technique from the labor regulation, their practical effects are verified, which will give a valuable experience for the design end construction of similar projects in the future.
出处
《山西建筑》
2008年第11期288-289,共2页
Shanxi Architecture
关键词
地表沉降
衬砌应变
大断面
settlement of the earth's surface, structure reaction, big cross section