厦门东通道CRD法施工段中隔壁安全性分析 被引量:4

Analysis of Security of Temporary Supports by CRD Method in Xiamen East Passageway
原文传递
导出
摘要 针对目前国内采用CRD法修建隧道施工过程中对临时中隔壁的安全性研究很少的情况,结合厦门东通道(翔安)海底隧道对中隔壁采用现场监测和数值模拟两种手段做了对比分析,两种方法所得结果吻合良好。研究结果表明,在CRD1、CRD3部超前和CRD1、CRD2部超前的情况下,中隔壁上部的水平位移都明显大于下部,但结构安全系数相差不大。以上研究为隧道的信息化施工提供了依据,也为今后的相关工程积累了经验。 In view of the lacked study on security of temporary supports on domestic tunnelling construction by CRD method at present,two ways are employed,in-situ monitoring and numerical simulation,in the phase of Xiamen East Passageway.The results turned out to be perfectly matched by comparison and analysis.The research indicates that horizontal displacement of upside is obviously higher than downside's whether CRD1、CRD3 keeps ahead or CRD1、CRD2 keeps ahead,and safety factor of temporary supports is basically the same.As a result,this study provides evidence for information-oriented construction of tunnel as well as experience for the future related projects.
出处 《公路》 北大核心 2008年第3期207-211,共5页 Highway
关键词 海底隧道 CRD法 中隔壁 安全分析 现场监测 数值模拟 信息化施工 undersea tunnel CRD method temporary supports security analysis in-situ monitor-ing numerical simulation information-oriented construction
  • 相关文献

参考文献5

二级参考文献15

  • 1朱合华,桥本正.盾构隧道管片接头衬砌系统的两种受力设计模型[J].工程力学,1996,13(A03):395-399. 被引量:28
  • 2朱合华 侯学渊 等.基坑开挖反馈设计分析.软土地基变形控制设计理论与工程实践[M].上海:同济大学出版社,1996.163-170.
  • 3朱合华,工程力学,1996年,10卷,增刊,395页
  • 4朱合华,软土地基变形控制设计理论与工程实践,1996年,163页
  • 5杨林德,岩土工程问题的反演理论与工程实践,1996年
  • 6桥本正,日本第30 回土质工学发表会讲演集,1995年,1693页
  • 7郑颖人,地下工程锚喷支护设计指南,1988年
  • 8TBJ108-92.铁路隧道喷锚构筑法技术规则[S].[S].,..
  • 9GB50218-94.工程岩体分级标准[S].[S].,..
  • 10JTJ026-90,工路隧道设计规范[S].

共引文献1336

同被引文献46

引证文献4

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部