35kV变电站标准化模式运用效果分析 被引量:2

Result analysis of application of standardized model of 35kV transformer station
下载PDF
导出
摘要 从1998年开始,广西水利电业有限公司投资44.5亿元,3年内建设改造35kV变电站400多座。在这样短的时间内,广西水利电业有限公司参考了区内外各种35kV变电站的设计及运行特性,精心制作,结合所辖43个县内变电站的实际特点,将35kV变电站归类设计为四种模式。变电站的标准化模式既节省了时间,又在加快工程实施进度、节约设备材料、降低工程建设投资等方面起到了积极作用。 Staring from 1998, Guangxi Water and Power Co. Ltd invested 4.45 billion Yuan within three years for the rehabilitation of more than 400 35kV transformer stations. The design and operation feature of varied kinds of 35kV substations were investigated and four design models were selected in line with actual condition of substations installed in 43 counties. It is found that the standardization of model of 35kV substations can not only save time, accelerate construction speed, but save materials and lower the construction cost.
作者 杨静
出处 《中国水利》 2008年第6期30-31,共2页 China Water Resources
关键词 广西 农村电网 标准化模式 变电站 Guangxi rural electricity grid standardized model transformer station
  • 相关文献

参考文献1

共引文献1

同被引文献3

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部