摘要
介绍了哈尔滨锅炉厂有限责任公司为湖南益阳电厂二期工程2×600MW超临界锅炉设计方案,预期运行性能和设计特点。该锅炉是哈尔滨锅炉厂有限责任公司在引进技术以后生产的首台贫煤锅炉。
The design scheme, expected performance and design characteristics of the boiler for Hunan yiyang power plant are introduced haerbin Boiler C. LT. The boiler is the first dry - burning coal boiler based on the introduced technology.
出处
《应用能源技术》
2008年第3期25-27,共3页
Applied Energy Technology